This was a 2,000 square feet ground up construction, addition, and tenant finish. It included an installation of a gravity drain cutoff trench to mitigate high ground water and excessive roof run-off at the West elevation, and a community garden after the installation of a 450 linear feet engineered drainage system.

PROJECT DETAILS

Client: Sister Carmen Community Center
Location: Lafayette, CO
Surface Area: 2,000 sq ft
Completed: 2011
Architect: Open Air Design